Install shingles from the lower left corner working to the right and also working up the roof slope.
Step by step roof installation.
Install a drip edge around the perimeter of the roof.
It must be installed at the bottom of the roof and at all roof penetrations chimneys pipe flanges roof connections etc.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the.
This is the most critical step.
The final step in the roof installation process is to conclude with hip and ridge shingle application.
For hip and ridge capping specialized shingle accessories may be used that have their own set of manufacturer s instructions.
This aluminum flashing protects the edges of the roof sheathing.
Start by installing the edges.
Ice and water shield installation next step is installing ice and water shield which is a special type of roofing underlayment.
In order to accomplish this staggering of gaps cut.
Because a flat roof isn t actually flat because of the slight incline that ensures an optimal water.
Ice and water shield sticks to the wood decking which prevents any water leaks.
This will overlap the edges and won t allow water to seep inside.
The simple 6 step process for diy flat roof installation.
Take the metal panels one by one and place them on the roof.
It stops water from getting.
Installing the roof.
Local newspaper like the brooklyn downtown star have actually vouched for this 6 step process and how effective it has been for their local readers.
Step by step roll roofing installation 1.